Monday, November 14, 2011
Remodeling Progress
David's been hard at work on Holly's new room. He had last Friday off due to a daycare closure since it was Veteran's Day so he had an extra day this weekend to work on it. The demolition is 100% done. The heating/venting is 100% done, he was really happy that turned out exactly how he planned it since he's never done that kind of work before. The electrical is 75% done, all that's left of that is once the wall has been built he can install the switch to the light fixture and connect to the power. He still needs to reroute the cable line (yep, that's different from electrical). Next he's building a drawer/closet unit and then he can build the wall around that unit to fit. So David made a lot of progress this weekend, but it's all the stuff that you won't be able to see once it's finished. So right now I'm doing lots of window shopping for a new bed and bedding mainly to watch for sales so we can pounce on it. Holly's been doing really well with the potty at home, so that's good news. For a while there she wasn't feeling like eating very much and now she's chowing down. I swear she's gotten taller. I haven't needed any preggie pops for nausea for over a week now. But I'm at 14 weeks and 1 day now so the first trimester is pretty much over. And if history repeats itself, that means I need to be as productive as possible during my 2nd trimester, because once the third trimester hits I'm going to slow way down and getting things done will become much more difficult.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment